Shuttle working portable traffic signals

To request the authorisation of shuttle working portable traffic signals please download and complete our application form.

To complete the form you must have a working knowledge of the following:

  • safety at street works and road works – a code of practice (red book)
  • traffic signs chapter 8
  • an introduction to the use of portable vehicular signals (pink book)
  • traffic signs regulations and general directions 2002

Application for the use of shuttle and multi-phase portable traffic signals (TS1) (PDF, 333 KB)

Completed forms should be returned to signalswitchoff@warwickshire.gov.uk.

If the proposed location for the shuttle working portable traffic signals is within 100m of permanent traffic signals or pedestrian crossings then the contractor also needs to give 10 days notice to the traffic signals team for switching the permanent traffic signals or pedestrian crossings off.

Update cookies preferences